Your Carbon Reduction Plan, done for you.
You send the bills. We build the plan. You sign it off.
Free plan: one site, one reporting year. Checked figures and the final plan on paid plans.
What we do
- Measure: Know your real footprint. Upload your bills and let Scopterra Read fill in the details, or import a year in one workbook. Scope 1, 2 and 3 with official UK government factors.
- Comply: See every deadline coming. Your compliance calendar: PPN 006, NHS 2027, SECR, ESOS, packaging and CBAM dates, with an email before each deadline that applies to you and what to do. Our Audit maps it for you.
- Reduce: Cut what actually counts. A costed reduction plan and carbon clauses for your contracts, delivered by us. Your suppliers share their own figures with you on Scopterra.
- Prove: Plans and answers, ready to send. Each tonne links back to its bill, report or certificate and, on paid plans, is checked by a second person, ready for tenders and audit.
Three scopes. One zero. Measure, comply, reduce and prove, in one place, on your way to net zero.
See what's driving your footprint.
Let's get you ready. Have us build your Carbon Reduction Plan, or start free in the platform. Fixed scope, fixed price. Free plan: one site, one reporting year. Checked figures and the final plan on paid plans.
See pricesStart free →Know your real footprint.
Upload your bills and let Scopterra Read fill in the details, or import a year in one workbook. Scope 1, 2 and 3 with official UK government factors.
- Measure
- Comply
- Reduce
- Prove
See what's driving your footprint.
Let's get you
ready.
Have us build your Carbon Reduction Plan, or start free in the platform. Fixed scope, fixed price.
Free plan: one site, one reporting year. Checked figures and the final plan on paid plans.
The product
See exactly where you are.
One screen says what is done, what is needed from you and what is due.
Harlow Electrical Ltd (example)
Here's where you are.


- PPN 006
- NHS 2027
- SECR
- ESOS
- UK CBAM
- EU CBAM
- GHG Protocol
- DESNZ factors
Sound familiar?
This year, your buyer asked for…
Each request needs the same figures, set out a different way. You give us the figures once.
- 01
A Carbon Reduction Plan.
Built to pass PPN 006's checks, from your figures, for your director to sign.
- 02
Scope 3 categories 4, 5, 6, 7 and 9.
The five PPN 006 asks for: a figure for each, or the reason there isn't one yet.
- 03
A signed plan on your website.
Your director signs it off by email; then it's ready to publish, with a page buyers can check it on.
- 04
A net zero answer in the tender.
Tender answers drafted from the same figures, each checked before it's ready.
- 05
An update next year.
Next year's plan keeps your baseline, sites and targets, and shows your progress against them.
Why Scopterra
Simple by design. Free to start.
Simple
Send your bills, answer a few questions, confirm what we read and sign it off. That's all we need from you.
Four things from youFree to start
Measure your carbon free. Pay only when you're ready to submit your plan. Free plan: one site, one reporting year. Checked figures and the final plan on paid plans.
Free planBuilt to pass
Before you sign, your plan is tested against PPN 006 or the 2027 NHS requirements, and a failed check stops it until it's fixed. Whether you win the bid is the buyer's decision.
PPN 006 · NHS 2027An AI agent for the rules
Ask Scopterra answers from our published guides and links the page each answer comes from.
Ask Scopterra
See how it works in 85 seconds.
From the bills you already have to a signed plan, done for you.
Done for you
One set of figures. Every rule.
We measure once. The same figures fill each document you need.
- Carbon Reduction PlanPPN 006 · NHS 2027
- Tender answersNet zero questions
- Annual climate reportEvery year
- SECREnterprise plan
You buy the result, not the tool.
Send us your bills. We do the rest, and you sign it off.
Carbon Reduction Plan
A signed PPN 006 or NHS 2027 plan for your bid, built from checked figures.
See prices →: Carbon Reduction PlanTender answers
The carbon and sustainability answers in a bid, drafted from your checked figures and checked by us.
See prices →: Tender answersAnnual climate report
Your year in six pages, from checked figures, for your board, your customers and your team.
See prices →: Annual climate report
Start free. Grow when you need to.
01 · Start
Free
- Scopterra Read 5 bills
- Sites and years 1 site, 1 year
- What you get Footprint + draft plan
Free plan: one site, one reporting year. Checked figures and the final plan on paid plans.
02 · Do it yourself
Self-serve
- Scopterra Read Up to 200 bills a month
- Sites and years All
- What you get Final plan, PDF and Word
03 · We do it for you
Done for you
- Your bills We read them, you confirm, we check every figure
- Sites and years All, 12 months included
- What you get A plan built for you
Five steps. Three are yours.
You send your bills
Upload them, or send them to us. Energy, fuel, travel: whatever you have.
We read, you confirm
Scopterra Read reads each bill and proposes its values; you confirm them. The official UK government factors turn them into tonnes.
We check every figure
Scopterra Review flags gaps and errors, then a Scopterra person checks each figure against its bill.
We write your plan
To PPN 006 or NHS 2027, from the checked figures, every number traced to its bill.
You sign it off
You read it, answer anything we ask, and sign it off. Then it's ready to publish.
Software does the work. People make it right.
The software
- Scopterra Read reads your bills
- Official factors turn usage into tonnes
- Scopterra Review checks every entry
- Our checks stop any figure that doesn't trace back to a bill
- The plan is written from the checked figures
The people
- You confirm what Scopterra Read proposes
- A Scopterra person checks every figure against its bill
- You sign it off
- Nothing is published until you do
Rather do it yourself? Self-serve, the same platform. See Self-serve →
Measure, comply, reduce, prove.
Know your real footprint.
Your Scope 1, 2 and 3 footprint from real bills, fuel cards, travel and supplier data, read from your bills by Scopterra Read, or imported in bulk.
In the platform Evidence Ledger with official DESNZ factors for 2024 to 2026.
See Measure →- 01 · The bill arrives
You upload it. Scopterra Read finds the supplier, invoice number, billing period, usage and amount.
- 02 · It becomes an entry
The official UK factor turns usage into emissions, with the bill attached.
- 03 · A second person checks it
Nobody checks their own entry. Once checked, it can't be edited.
- 04 · It lands in your plan
Every checked number in the plan traces back to its bill. Ready to publish.
Example figures and names, for illustration
See every deadline coming.
A gap assessment and a compliance calendar for PPN 006, NHS 2027, SECR, ESOS, packaging EPR, UK and EU CBAM and EUDR.
In the platform Deadline alerts set by what you do, what you import and who you sell to.
See Comply →Cut what actually counts.
A costed decarbonisation roadmap, supplier evidence shared with you by your suppliers, and carbon clauses for your contracts.
In the platform Supplier data collection, with reminders and certificate expiry dates.
See Reduce →Plans and answers, ready to send.
Carbon Reduction Plans, tender answers and claims reviews, where every number traces back to its source.
In the platform An audit trail on every figure, checked by a second person, and tender answers drafted from those figures, each checked before it's ready.
See Prove →Free tools
Try it now.
Your sector, your spend and, if you like, your energy bills: a rough range in ten seconds. Try the estimate →
Free Carbon Reduction Plan check
Upload your Carbon Reduction Plan and see which PPN 006 or NHS 2027 requirements it meets and what to fix. No sign-up; we don't keep your plan.
Which carbon plan does this bid need?
For NHS procurements that start on or after 1 April 2027, the NHS asks for one of two plans, depending on the contract. Answer what you know; the answer quotes the guidance it comes from.
How we check
Evidence that stands up to scrutiny.
Five checks on every paid plan before it's final.
- 01
Every figure comes from its source document.
CHECKEDEach entry carries its bill, invoice or report. How it works →
- 02
A second person checked it.
CHECKEDNobody checks their own entry. Corrections are new versions, never edits. How it works →
- 03
Official factors, unmodified, fingerprinted.
CHECKEDUK government factors as published, with a fingerprint for every file we load. How it works →
- 04
Checked against the rules before it's final.
CHECKEDTested against PPN 006 or NHS 2027. A failed check stops the plan until it is fixed. How it works →
- 05
It says what it leaves out, and why.
CHECKEDAn empty required Scope 3 category carries your explanation into the plan. How it works →
Ask Scopterra · AI assistant
Ask about the rules. Get the source.
Each answer links the page it comes from. When it can't answer, it gives you the closest page and our email address.
Ask Scopterra
An AI assistant. It answers from our published guides.
Hello. Ask me anything about the rules, or tell me your situation.
Try asking:
AI assistant. It can be wrong: check the linked page. Not legal advice. Talk to a person: hello@scopterra.com
What's changing, and when
One platform for what lands next.
- Feb 2025
PPN 006 Carbon Reduction Plans
In forceBidding for central government work over £5m a year? Your plan is pass or fail. →
- Yearly
SECR energy and carbon reporting
In forceLarger companies put energy use, emissions and a ratio in their annual report. →
- 1 Jan 2027
UK Carbon Border Adjustment Mechanism
Next · 1 Jan 2027Aluminium, cement, fertiliser, hydrogen, iron and steel imports start paying for their carbon at the border. →
- 1 Jan 2027
UK Sustainability Reporting Standards
WatchListed companies: periods from 1 January 2027. →
- 1 Apr 2027
2027 NHS Carbon Reduction Plans
WatchNHS contracts of £5m a year or more need every relevant Scope 3 category and a global boundary. →
Checked against GOV.UK on 2 October 2026: PPN 006 (opens in a new tab) · UK CBAM (opens in a new tab) · UK SRS (opens in a new tab). Checked against NHS England's guidance on 13 October 2026: NHS 2027 (opens in a new tab).
For any size
From one site to a group of companies, with auditor access and an API.
Free tools
Rough size
Your sector, your spend and, if you like, your energy bills: a rough range in ten seconds.
Try the estimate →Our factors
- Official UK government factors. Untouched.
- Locked. A correction is a new version, never an edit.
- Scopterra Read reads your bills. It never picks your factors.
- Every checked figure has its document attached.
- No factor? Not counted, and we tell you.
Tell us your next deadline.
A tender, a buyer's questionnaire, CBAM or your annual report: we'll reply within one working day with what you need and what it costs.
Free plan: one site, one reporting year. Checked figures and the final plan on paid plans.